Our Phoenix office is now located at 5050 N. 40th St., Ste. 100, Phoenix, AZ 85018. Phoenix (602) 252.8384 | Prescott (928) 445.5595
AAWC

Location: Buckeye, Arizona
Client: Arizona American Water Company

Agua Fria – Trunkline Relocation

As part of the Flood Control District of Maricopa County’s White Tanks FRS No. 3 Outfall Channel Project, Hoskin Ryan provided relocation design, survey, and construction staking services for approximately 200-feet of 16-inch ductile iron water line in Jackrabbit Trail, 100-feet of 24-inch ductile iron water line in Camelback Road and removing 200- feet of 8-inch of water line in Colter Street. The relocations of the 16-inch and 24-inch pipe and the elimination of the 8-inch pipe were necessary due to interference with FCDMC’s White Tanks FRS No. 3 Outfall Channel. In addition, Hoskin Ryan coordinated the removal of approximated 30 individual water services associated with this project. All plans were completed on time and on budget.
Project Requirements / Unique Characteristics:

  • Dipped Waterline Design
  • Utility Conflict Resolution
  • Multiple Jurisdictional Review