Eastmark Master Planned Community – Mesa, AZ

About Project

Hoskin Ryan was responsible for all Civil Engineering design including paving, grading and drainage, water, sewer and storm drain design for the infrastructure roadways associated with the Eastmark Master Planned Community. The Eastmark project is 6+ miles of infrastructure for close to 1,000 lots and a 10 acre park in the first phase. The Hoskin Ryan team provided planning, survey and final engineering services for 4.5 miles of arterial infrastructure roadway and one mile of drainage channel infrastructure. Extensive coordination was required with the City of Mesa, the Flood Control District of Maricopa County and all utility companies.

  • ClientDMB Mesa Proving Grounds, LLC
  • LocationMesa, Arizona